The project of reconstruction of highway M-03 Kyiv-Kharkiv-Dovzhansky on the section Lubni – Poltava within the joint project of Ukraine and the International Bank for Reconstruction and Development “The second project to improve roads and traffic safety”.
The total amount of the project is 450 mіllion USD. Completion: December 31, 2016.
The project includes:
As part of the initiative CoST provides for disclosure of information on such objects:
Contract number 2.1 Lot 2.1 (km 210 + 000 – km 220 + 782);
Lot 2.2 (km 228 + 000 – km 239 + 317);
Lot 2.3 (km 258 + 000 – km 275 + 000). Total 65 km.
Contractor: «Todini Construzioni Generalli S.p.A».
Date of contract signature: 04/01/2013.
The amount of contract: 128 095 799.79 US dollars.
Engineer Technical Supervision: IRD Engineering.
Term of completion of the contract: 31.07.2016.
Contract number 2.2 Lot 2.4 (km 282 + 000 – km 300 + 550);
Lot 2.5 (km 300 + 550 – km 323 + 000);
Lot 2.6 (km 329 + 050 – km 333 + 250). Total 51.25 kilometers.
Contractor: «Todini Construzioni Generalli S.p.A».
Date of contract signature: 04/01/2013.
The contract: 122 384 576.52 US dollars.
Engineer Technical supervision: Egis International.
Term of completion of the contract: 15.07.2016.